15
Jul
2012
0

2012 day 24 | thinking, mapping her dis-posing + loading

ME

___ remove tubular and rubber load from truck.

___ label parts.

___ take down interior rubber sheeting

___ roll up rubber sheeting

___ remove stitching between modular units

___ remove upper level rubber trim

___ prep to secure or counterbalance units

CREW

___ remove units alternating sides so as not to flip tabletop sections

___ perhaps roll rubber modular units

___ take down tabletop units

___ disassemble middle tt section

___ lower joists

___ remove fabricated hardware + secure to take home

___ lay chairs down

ME

___ remove front to back lateral runs

___ lift of seat

___ collapse structure

___ load chair

___ determine tool bin travel location

CREW

___ load rubber modules

___ if weight accommodates, load rolled rubber sheeting

ME

___ organize and load tools

UMMM leaving, a to do list for brian

___ relocate cinder blocks to JT

___ disassemble + relocate 2x4s to green tarped area near Woodstock

___ confirm no trace left behind